DCG’s Industrial team, Nick Knecht, CCIM, Joel Fountain, SIOR, and Baker Krukow, represented Sierra General for the sale of a 19,200-square-foot industrial build-to-suit at 635 Denmark Drive in McCarran, Nevada for tenant CMC Rebar, a nationwide Commercial Metals Company. The project is located within the Tahoe-Reno Industrial Center, and included a standalone free span metal building equipped with multiple interior and exterior bridge cranes, on a 5-acre land parcel with a paved laydown yard area. The build-to-suit project was completed in late 2022 and took a little over a year to complete. CMC Rebar, a Commercial Metals Company, is the leading concrete reinforcing steel fabricator in the U.S., with advanced metal fabrication facilities across the country. They are a construction solutions provider that furnishes and installs fabricated rebar and associated accessories for the construction industry. Their services include estimating, detailing, and fabrication to help manage any project, no matter the size or schedule demands.
Sierra General is a locally owned, comprehensive real estate development company that facilitates planning, development, and construction from concept to high-quality, completed projects. Their team of experts brings extensive backgrounds together to provide experienced solutions for a variety of construction, build-to-suit, architectural, engineering, and design projects. They work closely with clients to ensure all aspects of a project’s needs and expectations are met. They successfully handle both small and large-scale projects in a variety of markets, including Nevada, California, Idaho, Arizona, Oregon, and Washington.